City of American Canyon Law Library
City of American Canyon Municipal Code.

18.26.010 Filing.

(A) Within twenty-four months after approval or conditional approval of a tentative subdivision map, tentative parcel map or vesting tentative map, the subdivider shall cause the subdivision or any substantial part thereof, to be surveyed and a final map prepared in conformance with the tentative subdivision map or tentative parcel map as approved or conditionally approved, otherwise all approvals of the tentative map shall expire.

(B) The tracing and two blue line or black line prints of the final map shall be filed with the city engineer together with a map checking fee set by resolution of the city council to be paid to the city engineer. A permanent, reproducible copy of the final map shall also be submitted. Prior to the recording of the final map with the county recorder, this permanent reproducible final map shall bear all required signatures and the civil engineers wet stamp.

(C) An extension of time, up to three additional years, for the filing of a final map may be granted by the city council, provided that written application for such extension is made by the subdivider prior to expiration of the tentative map or vesting tentative map.

(D) At the time of the filing of the final map with the city engineer, the subdivider shall also file therewith the following:

(1) A recordable instrument prohibiting traffic over the side lines of a major highway, parkway, street or freeway, when and if required under the provisions of this title. A dedication of a planting strip may be accepted as a satisfactory alternative.

(2) A copy of the deed restrictions applicable to the subdivision.

(3) Sheets or drawings showing traverse closures and the computation of all distances, angles and courses shown on the final map, ties to existing and proposed monuments, and adjacent subdivisions, street corners, and/or highway stations.

(4) Two copies of infrastructure improvement plans.

(5) Subdivision agreement.

(6) The resolution of the planning commission and/or city council and all conditions of approval.

(7) A title report.