18.20.025 Statements.
Accompanying the tentative parcel map, or on said map, shall be statements by the subdivider as follows:
(A) Statement of existing zoning and existing and proposed use or uses;
(B) Statement and report on soil tests by a registered geotechnical engineer as required by this title;
(C) Statement as to intention of subdivider to control erosion and improvements to be constructed by him, as required by this title and any other applicable ordinances of the city;
(D) Statement indicating building setback lines;
(E) Proposed source of water supply and method of sewage disposal;
(F) Proposed type of tree planting and landscaping including indication of any existing trees to be removed or left in place;
(G) Proposed public areas to be dedicated or scenic easements proposed;
(H) Type and location of street lighting proposed in conformance with the adopted standards of the city of American Canyon;
(I) Statement as to development of lots whether for sale as lots or fully developed homes and lot lease or financing purposes;
(J) Preliminary title report prepared by a qualified title insurance firm;
(K) Justification and reasons for any exceptions to provisions of this title;
(L) The subdivider shall submit with the tentative parcel map, a copy of a letter to each serving utility and agency requesting submission of utility ease-
ment requirements and a copy of the reply of each affected utility and agency;
(M) A geological report shall be required in any area, so determined by the city engineer, where there are known geological hazards;
(N) Existing conditions, restrictive reservations or covenants, and any which are proposed shall be attached to the above statement;
(O) Any additional information as may be deemed necessary by the community development director and/or city engineer.