City of American Canyon Law Library
City of American Canyon Municipal Code.

14.24.090 Termination of permit.

(A) Significant industrial users proposing to discharge into the POTW, must first obtain a wastewater discharge permit from the city. Any user who violates the following conditions of this chapter or a wastewater discharge permit or order, or any applicable state and federal law, is subject to permit termination:

(1) Violation of permit conditions;

(2) Failure to accurately report the wastewater constituents and characteristics of its discharge, including baseline monitoring report, within the required time frame;

(3) Failure to report significant changes in operations or wastewater constituents and characteristics;

(4) Refusal of reasonable access to the user's premises for the purpose of inspection, monitoring, or sampling.

(B) Noncompliant industrial users will be notified of the proposed termination of their wastewater permit and be offered an opportunity to show cause (as set forth in Section 14.24.030 of this chapter) why the proposed action should not be taken.