14.16.030 Discharge permit elements.
Every significant industrial user and any other industrial deemed necessary by the city must be issued a permit. The minimum components contained with the permit are:
(A) Duration of permit (three years maximum);
(B) Nontransferability of permits;
(C) Applicable effluent limits (local, state, federal);
(D) Self-monitoring, sampling, reporting, notification and recordkeeping requirements, identification of pollutants to be monitored, sampling location, sampling frequency, and sample type;
(E) Civil and criminal penalties;
(F) Compliance schedules which may not exceed the compliance date beyond applicable federal deadlines. (Ref. 40 CFR 403.8(f)(1)(iii).)