City of American Canyon Law Library
City of American Canyon Municipal Code.

14.16.030 Discharge permit elements.

Every significant industrial user and any other industrial deemed necessary by the city must be issued a permit. The minimum components contained with the permit are:

(A) Duration of permit (three years maximum);

(B) Nontransferability of permits;

(C) Applicable effluent limits (local, state, federal);

(D) Self-monitoring, sampling, reporting, notification and recordkeeping requirements, identification of pollutants to be monitored, sampling location, sampling frequency, and sample type;

(E) Civil and criminal penalties;

(F) Compliance schedules which may not exceed the compliance date beyond applicable federal deadlines. (Ref. 40 CFR 403.8(f)(1)(iii).)